Welcome to Competitive Edge Products, Inc!

BBB link to Competitive Edge Products, inc.1-866-308-5484
M-F 7am-5pm MST

41502b Lifetime Impact Portable Basketball Hoop System

Availability: Out of stock

$174.99

Quick Overview

41502b Lifetime Impact Portable Basketball Hoop System

41502b Lifetime Impact Portable Basketball Hoop System

Double click on above image to view full picture

Zoom Out
Zoom In

More Views

  • 41502b Lifetime Impact Portable Basketball Hoop System

Details

Product: 41502B B-Stock refurbished Lifetime Portable Basketball Hoop

B-Stock means there may be small aesthetic issues such as scratches or small dents, but is a fully functional unit that includes full warranty from the manufacturer Lifetime Products

Save Money! 41502 retails for $124.99 online.

Local pickup available to avoid the shipping charges.

44" Impact Backboard

  • Molded of High-Impact Polyethylene
  • Fade-Resistant Graphics
Slam-it Rim with Spring-Back Action
  • Double Compression Springs
  • Nylon Net Included
Quick Adjust Mechanism
  • Adjusts from 7.5 to 10 Feet in 6-Inch Increments
  • Use Broomstick to Raise and Lower Backboard
3.5" Round Pole
  • Powder-Coated Rust-Resistant Finish

28 Gallon Portable Base

  • Fills with Sand or Water
  • Rolls to Desired Location

Additional Information

Customers Viewed N/A
FAQ N/A
SKU 41502B
Manufacturer Lifetime Products
UPC No
Amazon No
Video N/A
CEP N/A

Be the first to review this product

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.